Hillcrest Reservoir and Water Supply Zone
We are improving the resilience of water supply to the Hillcrest area and making sure the Hillcrest Community have a steady, safe and reliable supply of drinking water for years to come.
Overview
Currently, the Hillcrest area is supplied directly from the Waiora Drinking Water Treatment Plant. The project will establish a dedicated Hillcrest pressure zone and provide local water storage through the construction of a new reservoir and associated infrastructure. This will reduce reliance on the treatment plant to meet day-to-day demand and ensure the community continues to receive a safe and reliable water supply during peak demand periods, planned maintenance, and emergency events.
The project also supports Hamilton's future growth by addressing existing water storage deficiencies, improving network performance, and enhancing the ability to monitor, manage, and protect the city's water supply system.
What we are doing
IAWAI is planning to build water storage reservoirs capable of holding 10 million litres of working storage volume of drinking water at 111 Cambridge Road, the site of the decommissioned Hillcrest Reservoir and former Hillcrest bowling club.
The project includes water storage reservoirs, a pump station, and bulk main water pipes that will connect the new reservoirs to the treatment plant. It will also include network pipes to supply water to the Hillcrest water zone.
The benefits of two smaller reservoirs
We’re proposing two smaller round reservoirs rather than one large tank.
- It makes better use of the site
- It is easier to operate and maintain the water system as needed
- It allows one tank to be serviced while the other stays online
How the reservoirs are being designed
The site layout and the dimensions of the reservoirs are being developed with the aim of reducing visual, noise and amenity impacts while meeting operating requirements.
Further information on the preferred site configuration will be shared as the design progresses.
Where the pipes will be located
We’re still assessing options for which roads the pipes will be installed under.
Further information on the preferred route will be shared as the design progresses.
Why we are doing it
The water supply network across Hamilton City has been progressively separated into water supply zones over the past decade. Water supply zones are a common way of managing urban water networks. By dividing the city into separate supply zones, water can be delivered at the right pressure, infrastructure can be maintained more efficiently, and the network can continue to grow while remaining reliable and resilient.
The existing Hillcrest area will be last part of the existing built parts of the city to have a dedicated water supply zone created; Water for the Hillcrest area is currently fed directly from the Waiora Water Treatment Plant to residential and non-residential customers. If there is a problem at the treatment plant or with the pipes supplying the area, water supply to Hillcrest could be affected.
Creating a dedicated water supply zone requires dedicated water storage reservoirs and dedicated filling main to fill the reservoirs, and a pump station and associated water pipes out to the customers.
The benefits of a water supply zone
Why 111 Cambridge Road?
Several sites in the Hillcrest area were considered for a new drinking water reservoir. Following this assessment, two locations were shortlisted for further investigation: Hillcrest Park and the former Cambridge Bowling Club site.
The two sites were then assessed against a range of factors, including operational needs, environmental impacts, planning requirements, cultural considerations, community impacts, and construction requirements.
Following this assessment, 111 Cambridge Road was selected as the preferred site.
Reasons we selected 111 Cambridge Road
Community engagement and more information
We are currently speaking to homeowners, residents and business owners next to, or near the site about the project, answering questions and taking their feedback.
Next year we will be asking for feedback through a formal consultation process. This is where the community can have their say on the look and feel of the reservoirs. We'll also be hosting drop-in sessions throughout the project.
Contact us
If you would like to know more, you can email us at hillcrestreservoir@iawai.co.nz