Skip to main content
  1. Phase 1

    Shortlisting sites

    A two-stage study looking at possible locations, site constraints and the type of facility needed.

  2. Phase 2

    Designation and approvals

    Includes formal designation, consultation and landowner agreements.

  3. Phase 3

    Design and construction

    Finalising the design and building the storage facility.

How does extra water enter the wastewater network?

There are many ways, including through:

  • wrongly connected household pipes, such as stormwater drains linked to the wastewater network
  • groundwater seeping into pipes under public and private land.

What is the difference between emergency wastewater storage and bulk wastewater storage?

Bulk storage tanks hold extra flow during heavy rain events until the network has room again. It is then pumped back into the network and flows to a treatment plant.

Emergency storage tanks are typically located near pump stations and are used when something fails, such as equipment or power. They give our crews time to reach the site to fix the problem.