IAWAI gears up in readiness for blazing summer
18 November 2026
Water services company IAWAI is preparing contingency plans and community education programmes ahead of an expected severe El Niño summer.
Drought conditions and high temperatures can impact both availability of water for treatment and supply, and the quality of the water through chemical changes or algae and bacteria levels in the Waikato River and other water sources.
Earth Sciences New Zealand (formerly NIWA) says New Zealand will feel the impacts of a ‘Very Strong’ El Niño event over spring and summer of 2026/27.
In a report to the IAWAI Board this week, IAWAI Head of Operations and Process Sarah Pitches says the wide-ranging readiness programme covers risk monitoring, demand management, operational contingency plans, communications, escalation and incident response.
IAWAI is working closely with both Hamilton City Council and Waikato District Council, as well as local Civil Defence and the Smart Water education programme.
A combination of operational planning and community education, including using the existing water restriction alert Levels, is designed to address the primary risks and maintain security of supply as temperatures rise.
Reduced water flows after a prolonged drought could create vulnerabilities through the Waikato River supply, particularly at Hamilton’s Waiora Treatment Plant, which has a fixed intake structure. If water levels drop lower than the intake, a contingency plan is to deploy a floating pumping station to pump water from a deeper part of the river.
At the Ngaaruawaahia Water Treatment Plant, reduced water flows and sand getting into the system could impact supply, while Raglan supplies will be dealing with the El Niño impacts at the same time as the traditional influx of visitors.
Across the region, high summer water use and peak demand mean any outage or network issue would be harder to manage.
Another potential issue is an increase in natural arsenic levels in the Waikato River, something historically seen in recent years during late spring and early summer, as well as other natural water quality impacts caused by high temperatures which may place extra pressure on treatment facilities.
The Waikato River is the main water supply source for IAWAI’s communities, supporting Waiora/Hamilton, Huntly, Ngaaruawaahia and Te Kauwhata, with Tuakau/Pookeno supplied through Watercare bulk-supply arrangements. Other supplies rely on springs, a stream and bores.
Read the full Board agenda for tomorrow's meeting here.